Welcome to visit Beijing Zulin Formwork & Scaffolding Co. Ltd. official website.

中文版   English    |    Service hotline:+86 010-69408442

PROJECTS
ZULIN FORMWORK
/
/
Tunnel Underground & Corridor

Tunnel Underground & Corridor

Tunnel construction of the east artificial island and the main line weir section of the Shenzhen-Zhongshan cross-river passage
2021-04-28

Tunnel construction of the east artificial island and the main line weir section of the Shenzhen-Zhongshan cross-river passage

Project name: Tunnel construction of the east artificial island and main line weir section of the Shenzhen-Zhongshan cross-river passage Construction unit: China Railway Tunnel Bureau Group Co., Ltd. Project location: Bao'an District, Shenzhen Service life: 2020 Products in use: single-sided brackets, wooden I-beams Formwork structure overview: main line and ramp construction, the total length of the main line is about 480 meters, and the total height of the box is 13.4 meters

查看详细
Steel formwork for tailrace bifurcation of Yunnan Changlongshan Hydropower Station
2021-04-28

Steel formwork for tailrace bifurcation of Yunnan Changlongshan Hydropower Station

Steel formwork for tailrace bifurcation of Yunnan Changlongshan Hydropower Station

查看详细
Wudongde Hydropower Station Dam Body 945 Corridor
2021-04-28

Wudongde Hydropower Station Dam Body 945 Corridor

Wudongde Hydropower Station Dam Body 945 Corridor

查看详细
Previous page
1
Search
OK
Cancel
TOP

Copyright © 2021  Beijing Zulin Formwork & Scaffolding Co. Ltd.  京ICP备19013303号-1  京公网安备11011302003283号

ONLINE MESSAGE

Username used for comment:
客户留言
Description:
验证码