Welcome to visit Beijing Zulin Formwork & Scaffolding Co. Ltd. official website.
Tunnel Underground & Corridor
Tunnel construction of the east artificial island and the main line weir section of the Shenzhen-Zhongshan cross-river passage
Project name: Tunnel construction of the east artificial island and main line weir section of the Shenzhen-Zhongshan cross-river passage Construction unit: China Railway Tunnel Bureau Group Co., Ltd. Project location: Bao'an District, Shenzhen Service life: 2020 Products in use: single-sided brackets, wooden I-beams Formwork structure overview: main line and ramp construction, the total length of the main line is about 480 meters, and the total height of the box is 13.4 meters
查看详细Steel formwork for tailrace bifurcation of Yunnan Changlongshan Hydropower Station
Steel formwork for tailrace bifurcation of Yunnan Changlongshan Hydropower Station
查看详细Wudongde Hydropower Station Dam Body 945 Corridor
Wudongde Hydropower Station Dam Body 945 Corridor
查看详细Follow WeChat
Or search "Beijing Zulin Formwork & Scaffolding Co. Ltd."
More exciting waiting for you!
Fax:+86-10-69409139
E-mail:office@zulinform.cn
Add:Juyuan Industry Field No.20 Mapo Town, Shunyi District Beijing
Copyright © 2021 Beijing Zulin Formwork & Scaffolding Co. Ltd. 京ICP备19013303号-1 京公网安备11011302003283号