Welcome to visit Beijing Zulin Formwork & Scaffolding Co. Ltd. official website.

中文版   English    |    Service hotline:+86 010-69408442

NEWS
ZULIN FORMWORK
/
/
/
Successful capping of main tower of Xuncheng road tuihe Bridge
Check category

Successful capping of main tower of Xuncheng road tuihe Bridge

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2021-03-31 15:58
  • Views:

(Summary description)Located between the south area of tuannan old city and the new area of Tuanbei, the project starts at the intersection of Xuncheng road and Leifeng road. The existing Xuncheng road is reconstructed. From south to north, it successively crosses Leifeng Road, tuanbin South Road, Tuanhe Road, tuanbin North Road and Guihua Minmin South Road, then connects with Xuncheng Road, and ends at about 46m south of the intersection of Xuncheng North Road and Guihua Jiulong street. The total length of the project route is 1.1km, including 632.28m bridge and 60m red line width. According to the road line position, the bridge crosses Tuanhe, tuanbin South Road and tuanbin North Road. In order to ensure the traffic of the road under the bridge, two places are considered to cross the road under the bridge, and the traffic space between the auxiliary road under the bridge and the road under the bridge is reserved; Some arc interchange ramps are set on the bridge to ensure the interchange between tuanbin north-south road and Xuncheng road across Tuanhe bridge.

Successful capping of main tower of Xuncheng road tuihe Bridge

(Summary description)Located between the south area of tuannan old city and the new area of Tuanbei, the project starts at the intersection of Xuncheng road and Leifeng road. The existing Xuncheng road is reconstructed. From south to north, it successively crosses Leifeng Road, tuanbin South Road, Tuanhe Road, tuanbin North Road and Guihua Minmin South Road, then connects with Xuncheng Road, and ends at about 46m south of the intersection of Xuncheng North Road and Guihua Jiulong street. The total length of the project route is 1.1km, including 632.28m bridge and 60m red line width. According to the road line position, the bridge crosses Tuanhe, tuanbin South Road and tuanbin North Road. In order to ensure the traffic of the road under the bridge, two places are considered to cross the road under the bridge, and the traffic space between the auxiliary road under the bridge and the road under the bridge is reserved; Some arc interchange ramps are set on the bridge to ensure the interchange between tuanbin north-south road and Xuncheng road across Tuanhe bridge.

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2021-03-31 15:58
  • Views:
Information

Located between the south area of tuannan old city and the new area of Tuanbei, the project starts at the intersection of Xuncheng road and Leifeng road. The existing Xuncheng road is reconstructed. From south to north, it successively crosses Leifeng Road, tuanbin South Road, Tuanhe Road, tuanbin North Road and Guihua Minmin South Road, then connects with Xuncheng Road, and ends at about 46m south of the intersection of Xuncheng North Road and Guihua Jiulong street. The total length of the project route is 1.1km, including 632.28m bridge and 60m red line width. According to the road line position, the bridge crosses Tuanhe, tuanbin South Road and tuanbin North Road. In order to ensure the traffic of the road under the bridge, two places are considered to cross the road under the bridge, and the traffic space between the auxiliary road under the bridge and the road under the bridge is reserved; Some arc interchange ramps are set on the bridge to ensure the interchange between tuanbin north-south road and Xuncheng road across Tuanhe bridge.

Scan the QR code to read on your phone

HOT NEWS

We warmly welcome the Malaysian delegation to visit Beijing Zulin Formwork & Scaffolding Co. Ltd.
2021-03-31

We warmly welcome the Malaysian delegation to visit Beijing Zulin Formwork & Scaffolding Co. Ltd.

On the afternoon of August 6, 2019, the University of Pahang (UMP), government agencies CIDB and cream visited Beijing Zhuoliang formwork Co., Ltd. The purpose of the Malaysian delegation's visit is to study the industrial building system (IBS), collect information, understand China's domestic market, share information, and promote bilateral cooperation and development.
查看详细
Successful capping of main tower of Xuncheng road tuihe Bridge
2021-03-31

Successful capping of main tower of Xuncheng road tuihe Bridge

Located between the south area of tuannan old city and the new area of Tuanbei, the project starts at the intersection of Xuncheng road and Leifeng road. The existing Xuncheng road is reconstructed. From south to north, it successively crosses Leifeng Road, tuanbin South Road, Tuanhe Road, tuanbin North Road and Guihua Minmin South Road, then connects with Xuncheng Road, and ends at about 46m south of the intersection of Xuncheng North Road and Guihua Jiulong street. The total length of the project route is 1.1km, including 632.28m bridge and 60m red line width. According to the road line position, the bridge crosses Tuanhe, tuanbin South Road and tuanbin North Road. In order to ensure the traffic of the road under the bridge, two places are considered to cross the road under the bridge, and the traffic space between the auxiliary road under the bridge and the road under the bridge is reserved; Some arc interchange ramps are set on the bridge to ensure the interchange between tuanbin north-south road and Xuncheng road across Tuanhe bridge.
查看详细
Self elevating building platform: intelligent residential building machine coming
2021-03-31

Self elevating building platform: intelligent residential building machine coming

"Self elevating building platform" is a new generation of intelligent residential building automation construction platform jointly built by Beijing Zulin Formwork & Scaffolding Co. Ltd. and country garden. Through the new intelligent construction robot construction platform which can be automatically lifted, the building on the construction site can not move, and the house production line can be synchronously lifted up with the building, so as to realize the intelligent automatic construction of the main body of the building.
查看详细
Search
OK
Cancel
TOP

Copyright © 2021  Beijing Zulin Formwork & Scaffolding Co. Ltd.  京ICP备19013303号-1  京公网安备11011302003283号

ONLINE MESSAGE

Username used for comment:
客户留言
Description:
验证码