Welcome to visit Beijing Zulin Formwork & Scaffolding Co. Ltd. official website.

中文版   English    |    Service hotline:+86 010-69408442

PRODUCTS
ZULIN FORMWORK
/
/
/
Tool Type Suspension Step Ladder
Number of views:
1000

Tool Type Suspension Step Ladder

Specifications: 2400×3600, 1500×3000, 1800×3300

Description: Tool-type suspended step ladders are used for deep foundation pits that have been excavated or are being excavated. Tool-type suspended step ladders can replace the temporary suspended step ladders erected by traditional floor fastener scaffolding for deep foundation pits. The construction has better safety and economy, and it provides convenience for the construction personnel to go up and down the foundation pit during the construction process. Its operation is simple, the installation is simple, and the use is convenient.

Tool Type Suspension Step Ladder

Description: Tool-type suspended step ladders are used for deep foundation pits that have been excavated or are being excavated. Tool-type suspended step ladders can replace the temporary suspended step ladders erected by traditional floor fastener scaffolding for deep foundation pits. The construction has better safety and economy, and it provides convenience for the construction personnel to go up and down the foundation pit during the construction process. Its operation is simple, the installation is simple, and the use is convenient.
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
Product description
规格:

Specifications: 2400×3600, 1500×3000, 1800×3300

Features:

  The tool-type foundation pit suspension step ladder is composed of a triangular bracket fixed on the top of the slope protection pile of the foundation pit and a cross-plate tower ladder suspended at the bottom of the bracket. The construction channel formed is spacious and comfortable to walk, which can meet the needs of personnel during the construction of the foundation pit. The upper and lower passage requirements of the product; the product components are all standard parts, and the pin-bolt connection structure is adopted to meet the needs of different structural forms of the foundation pit. The installation and disassembly are simple and high-efficiency; the cross-tower ladder is a standard section combination structure, which can be excavated with the foundation Gradually extend to the bottom of the foundation pit, and remove it layer by layer as the foundation pit is constructed upwards to flexibly meet the requirements of the construction process during the construction of the foundation pit; except for the cooperation of hoisting equipment during the first installation and final removal, no other lifting is required during the construction process Equipment coordination can save the use times of tower cranes.

Technical parameters:

  1. Specifications: 2400×3600, 1500×3000, 1800×3300;

  2. Installation height: ≤25m;

  3. Concrete strength at anchorage: ≥ 15MPa;

  4. Construction load: ≤2KN/m

  5. Attached Wall distance: ≤2m

We could not find any corresponding parameters, please add them to the properties table
There is currently no content to display
Please add data record on website background.
There is currently no content to display
Please add data record on website background.
ENGINEERING APPLICATION
Search
OK
Cancel
TOP

Copyright © 2021  Beijing Zulin Formwork & Scaffolding Co. Ltd.  京ICP备19013303号-1  京公网安备11011302003283号

ONLINE MESSAGE

Username used for comment:
客户留言
Description:
验证码