Welcome to visit Beijing Zulin Formwork & Scaffolding Co. Ltd. official website.

中文版   English    |    Service hotline:+86 010-69408442

PRODUCTS
ZULIN FORMWORK
Number of views:
1000

Auto Climbing Formwork ZPM125

Specification: ZPM125

Description: The power source of the hydraulic climbing template is its own hydraulic system. The hydraulic system is composed of pump stations, hydraulic cylinders and oil pipes. Through the hydraulic system, the template frame and the guide rail can climb mutually, so that the hydraulic climbing template is stable Climb up. The hydraulic climbing formwork does not require other lifting equipment during the construction process, which is easy to operate, fast climbing speed and high safety factor. It can climb straight or diagonally, and is the preferred formwork system for high-rise building construction and bridge construction.

Auto Climbing Formwork ZPM125

Description: The power source of the hydraulic climbing template is its own hydraulic system. The hydraulic system is composed of pump stations, hydraulic cylinders and oil pipes. Through the hydraulic system, the template frame and the guide rail can climb mutually, so that the hydraulic climbing template is stable Climb up. The hydraulic climbing formwork does not require other lifting equipment during the construction process, which is easy to operate, fast climbing speed and high safety factor. It can climb straight or diagonally, and is the preferred formwork system for high-rise building construction and bridge construction.
Retail price
0.0
Market price
0.0
Number of views:
1000
Product serial number
Quantity
-
+
Stock:
Product description
规格:

Specification: ZPM125

Features:

1. The climbing form is powered by hydraulic cylinders or hydraulic lifting jacks, without the need for repeated assembly and disassembly of tower cranes, saving manpower, low labor intensity, and high degree of mechanization.

2. Climbing and construction are kept connected with the structure, and the safety is good; the multi-layer operation platform is used for safe operation.

3. The formwork and the frame body climb at the same time, the construction speed is fast, and the construction period cost is saved.

4. The components of the climbing mold are assembled by tools, which are easy to install and dismantle, have strong versatility, are suitable for the turnover of various projects, have low amortization costs and save materials.

5. The template demoulding adopts adjusting support and horizontal backward moving device, which is easy to operate and ensures the smooth demoulding of the template. The template is self-climbing and cleaned in situ, which can save the template stacking site and the construction site is civilized.

6. Under the premise of checking calculation permission, it can be realized that the walking ladder can be hung on the main frame and docked with the construction elevator; while carrying the cloth machine to climb at the same time.

7. Hydraulic climbing formwork has good effects in terms of project quality, safety production, construction schedule, cost reduction, improvement of work efficiency and economic benefits.

Technical Parameters:

Weight of single frame: 2.8T

widest platform: main platform=2.8m;

rated pressure: 25Mpa;

cylinder stroke: 400mm;

rail step: 300mm;

hydraulic pump station flow: 60L/min;

extension speed: about 200mm/ min;

rated thrust: 125KN; maximum 280KN;

double cylinder synchronization error: ≤20mm;

climbing speed: 10 minutes/m;

inclination: ±5°;

pouring layer height: 4-6m;

force bolt: M42 10.9

We could not find any corresponding parameters, please add them to the properties table
There is currently no content to display
Please add data record on website background.
There is currently no content to display
Please add data record on website background.
ENGINEERING APPLICATION
Search
OK
Cancel
TOP

Copyright © 2021  Beijing Zulin Formwork & Scaffolding Co. Ltd.  京ICP备19013303号-1  京公网安备11011302003283号

ONLINE MESSAGE

Username used for comment:
客户留言
Description:
验证码