Welcome to visit Beijing Zulin Formwork & Scaffolding Co. Ltd. official website.

中文版   English    |    Service hotline:+86 010-69408442

                                                                                                    WhatsApps:    +86-13701208027

PROJECTS
ZULIN FORMWORK
/
/
/
Tunnel construction of the east artificial island and the main line weir section of the Shenzhen-Zhongshan cross-river passage

Tunnel construction of the east artificial island and the main line weir section of the Shenzhen-Zhongshan cross-river passage

(Summary description)Project name: Tunnel construction of the east artificial island and main line weir section of the Shenzhen-Zhongshan cross-river passage Construction unit: China Railway Tunnel Bureau Group Co., Ltd. Project location: Bao'an District, Shenzhen Service life: 2020 Products in use: single-sided brackets, wooden I-beams Formwork structure overview: main line and ramp construction, the total length of the main line is about 480 meters, and the total height of the box is 13.4 meters

Tunnel construction of the east artificial island and the main line weir section of the Shenzhen-Zhongshan cross-river passage

(Summary description)Project name: Tunnel construction of the east artificial island and main line weir section of the Shenzhen-Zhongshan cross-river passage
Construction unit: China Railway Tunnel Bureau Group Co., Ltd.
Project location: Bao'an District, Shenzhen Service
life: 2020
Products in use: single-sided brackets, wooden I-beams Formwork
structure overview: main line and ramp construction, the total length of the main line is about 480 meters, and the total height of the box is 13.4 meters

Information

Project name: Tunnel construction of the east artificial island and main line weir section of the Shenzhen-Zhongshan cross-river passage

Construction unit: China Railway Tunnel Bureau Group Co., Ltd.

Project location: Bao'an District, Shenzhen Service

life: 2020

Products in use: single-sided brackets, wooden I-beams Formwork

structure overview: main line and ramp construction, the total length of the main line is about 480 meters, and the total height of the box is 13.4 meters

 

Scan the QR code to read on your phone

There is currently no content to display
Please add data record on website background.
Search
OK
Cancel
TOP

Copyright © 2021  Beijing Zulin Formwork & Scaffolding Co. Ltd.  京ICP备19013303号-1  京公网安备11011302003283号

ONLINE MESSAGE

Username used for comment:
客户留言
Description:
验证码